Ranett Avenue Culvert Repair

​Work is planned in the roadway in front of homes 7816 to 7832 Ranett Avenue. This project includes the removal and replacement of two, failing, metal culverts under the roadway with a new concrete box culvert.

Project Timing

  • Late fall and winter, 2016
  • Duration is approximately 30 days.
  • The ROAD WILL BE CLOSED for 15 days.
  • Local residents will be provided advanced notification.
  • Detour signage will be posted during the road closure.