Demolition of the 17 W. Streetsboro Street building is scheduled to begin at 2 p.m. on Monday, June 27. Work performed between 2 p.m. and 9 p.m. will be restricted to the site. Between 9 p.m. and 6 a.m., there will be a lane closure on East and West Streetsboro Street between E. Main Street and First Street. Two-way traffic will be maintained. Police will assist with traffic at the SR 303 and SR 91 intersection. Please drive slowly as you make your way through the construction zone.